Sunday, 3 March 2013

Production log

Okay it the final week before my deadline, im really struggling on my music video, these last 10 seconds is all i need however do that I have to arrange of me to use my the stage in my school however there is a school production coming up and therefore rehearsals for that are not allowing me  to use the stage.
Digipack is all done, and all i need is just for my audience to give me feed back
evaluations: 3 out of 4 have been typed up. i will be typing up the last one ASAP then using different formats i will be posting them on my blog. for each question i will be useing a different format which will be, video, prezi, document and power point. this i know i can complete by the next monday which is the 11/03.